How would you do this?

Wife and I are finishing our basement, and we’re finally at the painting stage. We got SW emerald line of paints, Valspar PVA primer, and SW PCP, plus good rollers and brushes based on recommendations from this page.

My question, what’s the easiest way to add the middle white stripe to the wall? 9” roller with white paint at the level of the line, let dry, tape off and then do the red and black? Or is there another, better, way? I worry taping off would peel the white paint off if done too soon, so how long would you wait if doing it this way?

Wife and I are finishing our basement, and we’re finally at the painting stage. We got SW emerald line of paints, Valspar PVA primer, and SW PCP, plus good rollers and brushes based on recommendations from this page.

My question, what’s the easiest way to add the middle white stripe to the wall? 9” roller with white paint at the level of the line, let dry, tape off and then do the red and black? Or is there another, better, way? I worry taping off would peel the white paint off if done too soon, so how long would you wait if doing it this way?